Project Date: Start > >. The brown material is just a. The electrical inspector requested. This cable. needs to enter the main panel at arrow 1, so we had to. We installed a 3/4 inch cable clamp (red. This clamp is just big enough for the 6- 3.
G sub- feed. cable. There was just enough room on the top of.
I doubt that a larger clamp. We fished the 6- 3 cable (red arrow). Then we stripped away the cable jacket and. We routed the ground wire around the. We connected the ground and the neutral. Note: It's ONLY at the MAIN panel. At the sub- panel, the neutral bus needs to be.
Then we ran the two hot wires around the. We stripped about 1/2. The breaker. connectors are spring- loaded and squeeze against the tab.